“‘It’s a good 20 hours of work,’ Lazzaro says. ‘Setting up the rigging, power, positioning the truck and building a projector booth from scratch. Then tearing it all down. It all has to be safe and low impact to the grounds.’ So why go to all this trouble when easier, albeit inferior digital cinema options are available? ‘We do the Lord’s work. That’s why.'” – WBUR’s The ARTery, 07/18/2017